How a Kratos floor gets built
Grinding, repair, base coat, flake and topcoat, run in the same order and to the same standard whether it is a two-car garage or a warehouse floor. Here is what actually happens at each step, and what to expect if you book an install.
A coated floor is only as good as what happens before the coating goes on. Most of the difference between a floor that lasts fifteen years and one that peels in eighteen months comes down to four things: how the concrete was profiled, whether cracks were chased and filled instead of coated over, whether moisture was tested for, and whether each layer was given the time it needed to bond before the next one went down. None of that is visible in the finished floor. All of it is visible in how the floor holds up.
The sequence below is the same one we run on every job — residential garages, patios, warehouse bays and retail floors alike. The scope changes with the project. The order and the standard do not.
01 / THE SEQUENCE
Six steps, expanded.
Scroll or swipe
02 / PREP
Why prep decides everything
- 01
Grinding, not acid etching
A diamond grinder mechanically opens the concrete pore structure so the coating keys into the slab instead of sitting on it. Acid etching only lightly roughens the surface chemically — it is faster and cheaper, and it is the single most common reason a competitor's floor peels within a year or two in Arizona heat.
- 02
Crack chasing
Cracks are chased out to a clean channel with a grinder, then filled with a flexible polyurea compound that moves with the slab instead of fighting it. Skip this and every crack telegraphs straight through the base coat, flake and topcoat.
- 03
Moisture testing
Concrete slabs on grade constantly push water vapor upward. We test for it before quoting, and add a moisture-mitigating primer when the reading calls for it, so the coating does not blister or delaminate from underneath months later.
03 / INSTALL DAY
What you should expect on install day
- Morning
The crew arrives, protects adjacent surfaces, and runs the diamond grinder across the full slab.
- Midday
Cracks are chased and filled, dust and debris are vacuumed, and the slab is checked for dryness before anything wet goes down.
- Afternoon
The base coat goes down, flake is broadcast to full refusal by hand, and loose flake is swept once it has set.
- Next day
The clear topcoat is rolled once the flake layer has cured. You can walk the floor.
- 48 hours
The floor is ready for vehicle traffic — timing shifts with temperature and humidity, so we give you exact times at scheduling.
Foot traffic is fine at 24 hrs?. Vehicle traffic waits until 48 hrs?, since cure speed shifts with temperature and humidity — we confirm exact timing when we schedule your install.
04 / QUESTIONS
Process questions
01 How long does a garage floor coating take?
Most two-car garages are ground, coated and flaked in a single day. You can walk on the floor the next day. Vehicle traffic waits a bit longer — ask for the exact return-to-service window when you get your quote, since it depends on temperature and the system used.
02 What if my slab already has cracks?
Most residential slabs have some cracking, and it does not disqualify a floor from being coated. Cracks are chased out and filled with a flexible repair compound before grinding, so they are far less likely to telegraph through the finished coat. Structural cracks or significant slab movement get flagged before we quote, not after.
03 What is moisture vapor mitigation, and do I need it?
Concrete slabs on grade constantly move water vapor up through the surface. If a coating goes down over a slab pushing more vapor than it can handle, the coating can blister or delaminate from underneath. We test moisture before quoting and add a mitigating primer when the reading calls for it.
04 How soon can I park in the garage after installation?
Foot traffic is fine well before vehicle traffic — the coating needs longer to cure to the point it can handle a parked car's weight and heat without marking. We give you exact times for both when we schedule your install, since cure speed shifts with temperature and humidity.
05 / GET A NUMBER
Get a number, not a pitch.
- 01
Send photos or book a visit
Whichever is faster for you — both work.
- 02
We measure and inspect
Slab condition, cracks and moisture, on-site or from your photos.
- 03
You get a written quote
A firm number and an install date, not a range that moves later.